# 2026-06 Conway Corporation Produces Project Stratus Records
On 2026-06-26, [[Conway Corporation]] delivered **"Production 002"** — its second Tier-1 document production — transmitted by Regulatory and Risk Management Director [[Chris Odom]] across five size-split ZIP files (`ConwayCorp_Production_002_Part1of5…Part5of5`), **62 responsive records (PROD-027…088), 76.3 MB**. It is the negotiation-and-contract record behind [[Project Stratus]]: the executed instruments, the effluent-cooling engineering and cost-recovery work, and — for the first time at Tier-1 — direct appearances of [[Google LLC]] personnel inside the transaction.
## Sources
- Cover emails from [[Chris Odom]] to [[Joshua Dunlap]], 2026-06-26 ([thread](https://mail.google.com/mail/u/0/#all/19e41be6d2204d32)); Part 1 states the five ZIPs "contain 62 additional responsive records."
- Ingested production: [[city-conway/conway-corp-stratus-002-2026-06-26/_overview|Conway Corporation Project Stratus Production 002]] (raw at `raw/city-conway/conway-corp-stratus-002-2026-06-26/`).
## What happened
The 62 records continue Production 001's Bates numbering (PROD-027…088). A hash-check against the full `raw/` tree found **3 byte-identical re-productions of Production 001** (`PROD-042`/`045`/`056`) and **1 internal duplicate** (`PROD-032`≡`PROD-046`) — noted, not re-ingested — leaving **58 net-new documents**, extracted into four themed source pages:
- [[Project Stratus Contract Instruments]] — the executed [[Black & Veatch]] NDA and Effluent Treatment Agreement, the [[Developer Reimbursement Agreement]] execution chain (Google-paid), and the four-party MOU signature routing.
- [[Tupelo Bayou Effluent Study RFQ and Engineering Reports]] — the TBWWTP study procurement (RFQ), the engineering reports and rate analysis, and the [[Effluent Reuse Rate and O&MR Charges|financial memo]] transmittal.
- [[Project Stratus MOU and Reimbursement Negotiation]] — the MOU markup correspondence and the parallel [[Entergy Arkansas]] substation "joint service agreement" track.
- [[Project Stratus Site Visits Scoping and Meetings]] — the 2024-onward coordination, site visits, parcel maps, and the water/effluent scoping thread.
## Significance
- **First Tier-1, first-party appearance of [[Google LLC]] in the Conway transaction** — [[Sydney Henry]] (Google Energy & Location Strategy) executes/pays the Reimbursement Agreement; [[Brian Bordenave]] and [[Tyson Schlect]] receive the Black & Veatch evaluation. Recorded as fact; the identification question is tracked at [[T005 - Google as the Project Stratus Customer]] and reserved for a prospective D007 dialectic.
- **The "who pays" question moves off open.** The executed effluent agreement assumes *capital* "paid for by the industrial facility," with a *reuse rate* for ongoing O&M (see [[Effluent Reuse Rate and O&MR Charges]]); the *study* is fronted by Conway and reimbursed by Google. The binding dollar figures (Reimbursement Agreement, MOU, reuse rate, the Entergy substation) remain in unproduced attachments.
- **New aliases** surface: **"Daze"** and the earlier **"Project Acorn."**
## Notes
- This is Conway Corporation's second production on the 2026-05-19 FOIA request, following [[2026-05 Conway Corporation Produces Project Stratus Records|Production 001]]; Odom's Production 001 cover had signaled "additional productions may follow."
- Highest-value follow-on FOIA targets: the executed Reimbursement Agreement (dollar amount), the 2026 Conway Effluent Financial Memo, the executed FINAL MOU + Appendix A, and the Entergy substation joint-service agreement.