# Project Pyramid SEEK Construction-Stormwater Records The 38 SEEK documents for **"Groot LLC – Project Pyramid"** (SEEK site **5189257**, **AFIN 18-01005**, 947 Bollinger Rd, West Memphis, Crittenden County) — the confirmed-Google West Memphis site's **water / construction-stormwater** record. Unlike the AVAIO site, this facility's SEEK profile is classified **SIC 7374 "Computer Processing and Data Preparation and Processing Services"** / NAICS 236210 — i.e., explicitly data-center-coded. The companion **Title V air permit** for the same site is at a second AFIN (18-01011) and lives in PDS — see [[Project Pyramid Title V Air Permit (2507-AOP-R0)]]. ## What's inside - **Three NOI families under CGP `ARR150000`:** the original `HQ8-3AQ0-RH2RG` (NOI v1–v3, 2025-02 → 2025-05; coverage **`ARR158639`**, NOC v1 2025-05-14 + Additional Acreage v2 2025-08-19), the modification `HQD-1ZD4-NKZ5R` (2025-07 → 2025-08), and a new NOI `HQG-7DRT-TV9WA` (coverage **`ARR158925`**, NOC 2026-01-13). - **Engineering plans:** SWPPP templates and signed SWPPPs, **Erosion Control Plans** (incl. a rev. 2025-02-06 and the "Hinkley Road Extension IFC" set), an **Overall Grading Plan**, a **Sediment Pond Exhibit**, and three large **"Submission and Permit Document Packages."** - **The USACE Permit Narrative & Wetland Mitigation Plan** (`04__…2024.11.22.pdf`, 136 pp; USACE File **MVM-2024-216**, Tioga Project 501507.01, Nov 2024) — the §404 wetland record for the site. - **Corporate/identity attachments:** a **Delegation of Authority** (`13__Groot LLC - DOA - David Thomas.docx.pdf`), Arkansas Secretary of State records, and entity-search "Owner Entity Proof" copies. - **Three `correspondence.pdf` chains** — DEQ ↔ developer permit-processing email. ## Key takeaways - **The Groot corporate stack (Tier-1).** The **Delegation of Authority** (executed 2025-07-31) states: *"The undersigned, Gabor Turschl … as President, Treasurer, and Secretary of GDH Holdings Inc., a Delaware corporation and Sole Member of Groot LLC … hereby delegates … David Thomas, Attorney at Wilson Sonsini Goodrich and Rosati … to sign as an Authorized Signatory"* (`13__Groot LLC - DOA - David Thomas.docx.pdf`, p. 1). This documents, for the first time at Tier-1: **[[GDH Holdings Inc.]]** = sole member of [[GROOT LLC]]; **[[Gabor Turschl]]** = its officer; and **[[David Thomas]]** = a **[[Wilson Sonsini Goodrich & Rosati]]** attorney/employee. Groot's principal place of business on the DOA is *"2801 Centerville Road, 1st Fl, PMB 160 Wilmington DE"* (CSC); the USACE narrative gives *"251 Little Falls Drive, Wilmington DE"* (also CSC). - **Both shell-officers are Wilson Sonsini lawyers.** [[Michael Montfort]] signs the SEEK submissions and the air permit as Manager/Authorized Signatory from **`[email protected]`** (Wilson Sonsini), and the DOA puts [[David Thomas]] at the same firm. This is the **Tier-1 Arkansas confirmation** of the professional-role question the [[T003 - Shell-LLC Principal Attribution for Forgelight and Willowbend|T003]] / [[D005 Synthesis|D005]] line had bracketed — they are **outside formation counsel / nominees, not in-house principals** (consistent with [[D006 Synthesis]]; restraint holds, no Google-as-principal naming). - **Project team (SEEK contacts).** Authorized Signatory/Responsible Official **[[Michael Montfort]]** (`[email protected]`, 202-973-8800); billing contact **Marissa Higgins ([[Kimley-Horn]],** Memphis) — the **same engineering firm as AVAIO Little Rock**; site manager **Jeff Borgsmiller** (`[email protected]` — **Turner Construction**). DEQ reviewer **Jorge Rodriguez Peña** (Office of Water Quality). - **The DEQ↔developer correspondence is routine permit-processing.** The `correspondence.pdf` chains are Kimley-Horn (Marissa Higgins) ↔ DEQ (Jorge Rodriguez Peña), cc Montfort, on stormwater-modification logistics (Hinkley Road extension limits-of-disturbance, BMP confirmation) — responsive to FOIA items 6/10 but containing **no principal identification**. - **No Google naming; no operational cooling-water source.** The narrative's only "Google" references are Google Maps/Earth location links; the records name no cooling-water source (the 60 cooling towers appear in the [[Project Pyramid Title V Air Permit (2507-AOP-R0)|air permit]], not here). ## People and orgs mentioned - [[GROOT LLC]]; [[GDH Holdings Inc.]] (sole member); [[Gabor Turschl]] (officer); [[David Thomas]] & [[Michael Montfort]] ([[Wilson Sonsini Goodrich & Rosati]]); [[Kimley-Horn]] (Marissa Higgins); Turner Construction (Jeff Borgsmiller); [[Google LLC]] (confirmed operator, not named here). ## Concepts invoked - [[Nationwide Permit]] — the USACE §404 track in the Permit Narrative (File MVM-2024-216). ## Cross-references - [[Project Pyramid Title V Air Permit (2507-AOP-R0)]] — the same site's air permit (AFIN 18-01011, PDS). - [[AVAIO Little Rock SEEK Construction-Stormwater Records]] — the parallel AVAIO/Leo water records. - [[assessor-crittenden/project-pyramid-2026-05-21/_overview|Crittenden County Project Pyramid production]]; [[Google Data Center Water-Use Registration]]. - [[T003 - Shell-LLC Principal Attribution for Forgelight and Willowbend]] — the attribution line (professional-role confirmation; no un-bracketing).