# Hybar Order No. 5 — Amended SRC Approval
The Commission's 8-page final order approving the Amended Special Rate Contract between Entergy Arkansas and [[Hybar LLC]]. Filed 2025-07-22. **The Commission cancels the previously-scheduled hearing and approves the Amended SRC based on the written record** following the Staff-EAL joint stipulation. Same structural posture as the [[Google SRC Order No. 5 Cypress Inextricability|Google SRC Order No. 5]] (joint motion to submit on the written record), but the Hybar case proceeded to a non-hearing disposition while the Google case was held to a hearing.
## Cross-references
See the [[psc/docket-23-025-p-hybar-2026-05-22/_overview|Docket 23-025-P production overview]] for context.