# Revised GAJA Rider Rate Schedule 73 Doc. 78 in [[psc/docket-26-008-tf-2026-05-22/_overview|Docket 26-008-TF]] — Entergy Arkansas's compliance filing (2026-06-05) of the revised Rate Schedule No. 73 and Attachments 1–3, incorporating the $463,000 rate-of-return correction approved by [[Order No. 7 Approving the GAJA Annual Update|Order No. 7]]. These are the per-class GAJA charges that actually appear on Arkansas electric bills, effective 6/4/26 (per the tariff header). ## What's inside - `26-008-TF_78_1.pdf` — revised Rate Schedule No. 73; Attachment 1 (Strategic Investment Rates by class), Attachment 2 (rate development), Attachment 3 (revenue-requirement summary). ## Key takeaways - **Revised Rider Test Period Revenue Requirement: $109,977,691** (Attachment 2, Line 2) — the post-correction figure, down from the filed $110.4M. - **Per-class rates and allocations** (Attachments 1–2; allocator = Rate Class Retail Production Demand Allocation Factor from Docket 25-049-TF): | Rate class | Allocator | 2026 revenue | Rate | |---|---|---|---| | Residential (RS, RT, REMT) | 39.3868% | $43,316,660 | $0.00574 per kWh | | Small General Service (SGS, GFS, TSS, MP, AP, CGS, CTV, SMWHR) | 24.9835% | $27,476,330 | $0.00686 per kWh | | Large General Service (LGS, LPS, GST, PST, LPHLDS, SSR, Special Contract as applicable) | 34.9119% | $38,395,332 | $1.21 per kW | | Lighting (L1, L1SH, L4, L1BNR) | 0.7178% | $789,369 | $0.00294 per kWh | - **Special Rate Contract customers are inside the Large General Service class** for GAJA allocation: the PDAF "shall be based on an annually updated load study to quantify contributions from each class, including applicable Special Rate Contract customers, to system coincident peaks" (Attachment 2, Note [1]). The rider thus reaches SRC customers only through the class-level $1.21/kW demand charge — the class-level socialization mechanics [[Who Pays for Entergy's New Generation]] documents. - Residential at 1,000 kWh/month pays **$5.74/month** ($0.00574 × 1,000) — the figure the $463K correction produced from Morey's filed $5.77. ## People and orgs mentioned - [[Entergy Arkansas]] — filer; [[Arkansas Public Service Commission]] — approving authority. ## Concepts invoked [[Generating Arkansas Jobs Act (GAJA) rider]] · [[Strategic Investment]] · [[Special rate contract]] · [[Cost-of-service study]] ## Events documented - [[2026-06 APSC Order No. 7 Approves the GAJA Rider Annual Update]] ## Cross-references - [[Order No. 7 Approving the GAJA Annual Update]] — the directive (Ordering ¶2) this filing complies with. - [[Staff Compliance Testimony on the Revised GAJA Rider]] — Staff's verification. - [[GAJA Rider 2026 Annual Update]] — the original Morey filing these rates revise. ## Open questions / follow-ups - The residential class carries 39.4% of the new-generation rider while the Large General Service class (where hyperscale SRC load sits) carries 34.9% — the next annually-updated PDAF load study (which must "quantify contributions from each class, including applicable Special Rate Contract customers") is the Tier-1 document to watch for how data-center load shifts the allocator.